Sparty'sRenovations for the Holmes Sparty’s have begun for what will become four separate spaces combined to deliver an incredible retail experience with high tech-high touch gathering spaces for students, faculty and staff. The renovation will include a retail sales space with new lighting fixtures and architectural finishes, a theater with two flat panel televisions, DVD players with controls at each seat, a central gathering space with a fireplace, computer gaming stations, and a seminar room with a smart board and seating for 15. The space will be air conditioned and the project will incorporate many sustainable features, including bamboo flooring, occupancy sensors, LED lighting and recycling.

Watch the progress as we make updates weekly to this page. When it's done by the end of summer, make sure to visit Holmes Hall Sparty's and see all the exciting changes!

 


  July 23

Sparty's

Workers are making a great deal of progress installing metal frames across the ceiling and forming new walls within the space. Utility framework, including electrical outlets and ceiling hooks for various wires and cables are being installed and light fixtures are also appearing.

 


  July 15

Workers continue to install metal frames for wall re-shaping. Different areas of the new Sparty’s space are being sanctioned off by metal frames and insulation is being installed. Work is also being done to ceiling utility pipes and fixtures.

 


 
July 3

Sparty'sThe Holmes Hall Sparty’s project is in full swing. Workers are in the process of installing metal frames for new space-reshaping walls, which will be insulated, covered in drywall and finished.

 


 
May 22

Sparty'sIt’s out with the old and in with the new as the former Holmes C-Store continues to be demolished to make way for the re-programmed space, including a new Sparty’s Coffeehouse.

 


 
May 15

The flooring of the former Holmes C-Store has been torn up and crews are continuing work on the transforming space.

 


 
May 7

Sparty's

Currently, all furniture and kitchen materials have been removed from the space. Ceiling tiles and flooring was removed ready for the next phase.